Shenzen Bao’an International Airport, Terminal 3
Shenzhen, China

Shenzen Bao’an International Airport, Terminal 3
Shenzhen, China

The concept of the plan for Terminal 3 of Shenzen Bao’an international airport evokes the image of a manta ray, a fish that breathes and changes its own shape, undergoes variations, turns into a bird to celebrate the emotion and fantasy of a flight.
The structure of T3 – an approximately 1,5-km-long tunnel – seems to be modeled by the wind and is reminiscent of the image of an organic-shaped sculpture. The profile of the roofing is characterized by variations in height alluding to the natural landscape.
The symbolic element of the plan is the internal and external double “skin” honeycomb motif that wraps up the structure. Through its double-layering, the “skin” allows natural light in, thus creating light effects within the internal spaces. The cladding is made of alveolus-shaped metal and glass panels of different size that can be partially opened.
The passengers accede to the terminal from the entrance situated under the large T3 “tail”. The wide terminal bay is characterized by white conical supporting columns rising up to touch the roofing like the inside of a cathedral. On the ground floor, the terminal square allows access to the luggage, departures and arrivals areas as well as coffee houses and restaurants, offices and business facilities. The departures room houses the check-in desks, the airlines info-points and several help-desks. The double and triple height spaces of the departures room establish a visual connection between the internal levels and create a passage for natural light. After checking in, the national and international passengers’ flows spread out vertically for departures.
The concourse is the airport key-area and is made up of three levels. Each level is dedicated to three independent functions: departures, arrivals and services. Its tubular shape chases the idea of motion. The “cross” is the intersection point where the 3 levels of the concourse are vertically connected to create full-height voids which allow natural light to filter from the highest level down to the waiting room set in the node on level 0.
The honeycomb motif is transferred and replicated on the interior design.
Shop boxes, facing one another, reproduce the alveolus design on a larger scale and recur in different articulations along the concourse.
The interiors designed by Fuksas – placed in the internet-point, check-in, security-check, gates and passport-check areas – have a sober profile and a stainless steel finish that reflects and multiplies the honeycomb motif of the internal “skin”
Sculpture–shaped objects – big stylised white trees – have been designed for air conditioning all along the terminal and the concourse, replicating the planning of amorphous forms inspired by nature. This is also the case for the baggage-claim and info-point “islands”.

SITE
Bao’an District, Shenzhen, Guangdong, China

PERIOD
2008-2013

International competition won 2008

The other 5 finalist:
Foreign Office Architects (Gb),
Foster and Partners (Gb),
Gmp International (Germania),
KishoKurokawa (Giappone),
Reiser+Umemoto (Usa).

Building site: 2009
Inauguration: November 28, 2013

AREA
500,000 sq.m.

PROGRAM
Airport Expansion Terminal 3

CLIENT
Shenzhen Airport (Group) Co., Ltd.

DEVELOPER
Shenzhen Planning Bureau; Shenzhen Airport (Group) Co., Ltd.

ARCHITECTS
Massimiliano and Doriana Fuksas

INTERIOR DESIGN
Fuksas Design:
internet-point, check-in ”island”, security-check, gates, passport-check areas, shop box, baggage-claim “islands”, info-point, ventilation trees, signage, commercial desk and washrooms

GENERAL CONTRACTOR
China State Construction Engineering Corporation Limited, China Construction Eighth Engineering Division

STRUCTURES, FACADE, PARAMETRIC DESIGN

KnippersHelbig Engineering, Stuttgart, NY

ARCHITECT OF RECORD
BIAD (Beijing Institute of Architectural Design), Beijing

LIGHTING CONSULTING
Speirs& Major Associates, Edinburgh, London

STEEL CONTRACTOR
China Construction the Third Engineering

FACADE CONTRACTORS
Shenzhen Sanxin Façade Engineering Co., Ltd; Shenzhen Ruihua Construction Co., Ltd; China Fangda Group Co., Ltd

INTERIOR CONTRACTORS
Shenzhen Decoration and Construction Industrial Co.,Ltd
Decoration Company OF China Construction Engineering 3rd Bureau
Shenzhen Hongtao Decoration Co., Ltd
Shenzhen City Decoration Co., Ltd
Shenzhen Building Decoration Group Co.,Ltd

SIGNAGE COMPANY
Shanghai Mission Information Technology Co,. Ltd

ADVISEMENT COMPANY
AirMedia Group Inc.

LUGGAGE SYSTEM
Vanderlande Industries

AIRPORT ELECTRICITY
Shanghai Hua Yu Electron Engineering Co., Ltd
Farad Electric Co., Ltd
Shenzhen Hongshi Co., Ltd

DRAINAGE SYSTEM
Beijing TIDELION S&I Rainwater Harvesting Technology Co., Ltd.V

ELEVATOR AND ESCALATOR
Otis; Kone

COST
734,000,000 Euros

The concept of the plan for Terminal 3 of Shenzen Bao’an international airport evokes the image of a manta ray, a fish that breathes and changes its own shape, undergoes variations, turns into a bird to celebrate the emotion and fantasy of a flight.

The structure of T3 – an approximately 1,5-km-long tunnel – seems to be modeled by the wind and is reminiscent of the image of an organic-shaped sculpture. The profile of the roofing is characterized by variations in height alluding to the natural landscape.
The symbolic element of the plan is the internal and external double “skin” honeycomb motif that wraps up the structure. Through its double-layering, the “skin” allows natural light in, thus creating light effects within the internal spaces. The cladding is made of alveolus-shaped metal and glass panels of different size that can be partially opened.
The passengers accede to the terminal from the entrance situated under the large T3 “tail”. The wide terminal bay is characterized by white conical supporting columns rising up to touch the roofing like the inside of a cathedral. On the ground floor, the terminal square allows access to the luggage, departures and arrivals areas as well as coffee houses and restaurants, offices and business facilities. The departures room houses the check-in desks, the airlines info-points and several help-desks. The double and triple height spaces of the departures room establish a visual connection between the internal levels and create a passage for natural light. After checking in, the national and international passengers’ flows spread out vertically for departures.
The concourse is the airport key-area and is made up of three levels. Each level is dedicated to three independent functions: departures, arrivals and services. Its tubular shape chases the idea of motion. The “cross” is the intersection point where the 3 levels of the concourse are vertically connected to create full-height voids which allow natural light to filter from the highest level down to the waiting room set in the node on level 0.
The honeycomb motif is transferred and replicated on the interior design.
Shop boxes, facing one another, reproduce the alveolus design on a larger scale and recur in different articulations along the concourse.
The interiors designed by Fuksas – placed in the internet-point, check-in, security-check, gates and passport-check areas – have a sober profile and a stainless steel finish that reflects and multiplies the honeycomb motif of the internal “skin”
Sculpture–shaped objects – big stylised white trees – have been designed for air conditioning all along the terminal and the concourse, replicating the planning of amorphous forms inspired by nature. This is also the case for the baggage-claim and info-point “islands”.


SITE
Bao’an District, Shenzhen, Guangdong, China

PERIOD
2008-2013

International competition won 2008

The other 5 finalist:
Foreign Office Architects (Gb),
Foster and Partners (Gb),
Gmp International (Germania),
KishoKurokawa (Giappone),
Reiser+Umemoto (Usa).

Building site: 2009
Inauguration: November 28, 2013

AREA
500,000 sq.m.

PROGRAM
Airport Expansion Terminal 3

CLIENT
Shenzhen Airport (Group) Co., Ltd.

DEVELOPER
Shenzhen Planning Bureau; Shenzhen Airport (Group) Co., Ltd.

ARCHITECTS
Massimiliano and Doriana Fuksas

INTERIOR DESIGN
Fuksas Design:
internet-point, check-in ”island”, security-check, gates, passport-check areas, shop box, baggage-claim “islands”, info-point, ventilation trees, signage, commercial desk and washrooms

GENERAL CONTRACTOR
China State Construction Engineering Corporation Limited, China Construction Eighth Engineering Division

STRUCTURES, FACADE, PARAMETRIC DESIGN

KnippersHelbig Engineering, Stuttgart, NY

ARCHITECT OF RECORD
BIAD (Beijing Institute of Architectural Design), Beijing

LIGHTING CONSULTING
Speirs& Major Associates, Edinburgh, London

STEEL CONTRACTOR
China Construction the Third Engineering

FACADE CONTRACTORS
Shenzhen Sanxin Façade Engineering Co., Ltd; Shenzhen Ruihua Construction Co., Ltd; China Fangda Group Co., Ltd

INTERIOR CONTRACTORS
Shenzhen Decoration and Construction Industrial Co.,Ltd
Decoration Company OF China Construction Engineering 3rd Bureau
Shenzhen Hongtao Decoration Co., Ltd
Shenzhen City Decoration Co., Ltd
Shenzhen Building Decoration Group Co.,Ltd

SIGNAGE COMPANY
Shanghai Mission Information Technology Co,. Ltd

ADVISEMENT COMPANY
AirMedia Group Inc.

LUGGAGE SYSTEM
Vanderlande Industries

AIRPORT ELECTRICITY
Shanghai Hua Yu Electron Engineering Co., Ltd
Farad Electric Co., Ltd
Shenzhen Hongshi Co., Ltd

DRAINAGE SYSTEM
Beijing TIDELION S&I Rainwater Harvesting Technology Co., Ltd.V

ELEVATOR AND ESCALATOR
Otis; Kone

COST
734,000,000 Euros

+